Zurück zu den Preprints des Jahres 1994


1994-08

Heuristics for Permutation Flow Shop Scheduling with Batch Setup Times.

by Sotskov, Y.N., Tautenhahn, T., Werner, F..


Series: 1994-08, Preprints

MSC:
90B35 Scheduling theory, deterministic

Abstract:

Keywords:
flow shop scheduling, batch setup times, group technology, manufacturing cells, heuristcs

This paper was published in:
OR Spektrum, 1996, Vol. 18, 67 - 80.